Expand Cut Tags

No cut tags
poliphilo: (Default)
[personal profile] poliphilo
The original projection- not that I ever really believed it- was for the work to be finished in six weeks. At the start of week seven we have two joiners on site- one laying laminate flooring in the bedrooms, the other assembling units in the kitchen. A third guy is gofering between them. 

Week seven is the week our tenure on the storage unit runs out, which is why we're bringing stuff back into the house. The problem is finding anywhere to stash it. 



I don't think we'll be bothering with a Christmas tree this year.

Date: 2010-12-06 10:44 am (UTC)
From: [identity profile] poliphilo.livejournal.com
You should see how much dust- much of it saw-dust- is on that mantle.

It's a nice bowl. It was a wedding present.

Profile

poliphilo: (Default)
poliphilo

March 2026

S M T W T F S
1 2 3 4 5 6 7
8 9 10 11 121314
1516 17 18 19 20 21
22 23 24 25262728
293031    

Most Popular Tags

Style Credit

Page generated Mar. 26th, 2026 02:05 am
Powered by Dreamwidth Studios