The original projection- not that I ever really believed it- was for the work to be finished in six weeks. At the start of week seven we have two joiners on site- one laying laminate flooring in the bedrooms, the other assembling units in the kitchen. A third guy is gofering between them. 

Week seven is the week our tenure on the storage unit runs out, which is why we're bringing stuff back into the house. The problem is finding anywhere to stash it. 



I don't think we'll be bothering with a Christmas tree this year.